Final plan for the main floor, modeled to scale in SketchUp. I discussed with the lead engineer to establish large moves and location for the new CNC machine (large upper left profile). I worked out everything in between--exact orientation, storage cabinets, worktables, manual machines.  Colors: green = in final position, orange = planned, not yet moved, red = remove, purple = review, brown = work surface, yellow = keep contents. Large shaded margins = space needed to service a machine; white circles = 12, 8 and 5 ft gauges for checking the new hallway widths.

Shop floor relayout without a shutdown

Ely Tool: 5S layout planned in SketchUp and sequenced so a working custom-tooling shop never closed

facility-layout5s-leanstakeholder-coordination